Chimney Tray Liquid Collector
Material: Sheet-metal parts, supports and joining consumables specified separately; 304 or 316L requests require factory review
A drawing-defined liquid-collection pan with covered rectangular gas chimneys and a side draw-off, separate from distributor metering trays and individual bubble caps.
Specification review
- Structure
- Solid-floor round collection pan, hooded rectangular gas risers and side draw-off
- Geometry
- Pan/riser/hood/gap and outlet dimensions to reviewed drawing
- Duty
- Vapor passage, liquid head, collection and sealing reviewed separately
Material and specification review
Solid-floor round collection pan, hooded rectangular gas risers and side draw-off
Specify these parameters separately
- Pan, chimney, hood-gap and outlet geometrymm
- Provide pan diameter/rim/thickness, riser section/height, hood profile/gaps and outlet bore/projection.
- Column, sealing and support interfacemm
- Provide column access, segments/seams, sealing faces, support and side draw-off orientation.
- Collection and vapor-duty validation—
- Designer defines liquid head/collection, vapor flow, corrosion and agreed tests; no capacity or pressure rating.
Unspecified dimensions, ratings and tolerances remain unconfirmed. Attach drawings, samples or equipment-interface details; the agreed document defines the final specification.
Typical applications
- Reviewed packed-column liquid collection and side draw-off duties
- Drawing-defined replacement collection trays
- Dry chimney/hood, outlet and column-access evaluation samples
Customizable details
- Pan diameter, rim height, thickness, segmentation and joining
- Rectangular gas-riser section, height, hood pitch and side clearances
- Draw-off bore, projection, orientation and joining
- Sheet/tube/support grades, support and sealing details
Before you request a quote
- Column internals, access and support drawings; pan envelope and segmentation
- Actual liquid collection/head and vapor-flow duty, corrosion and cleaning
- Riser/hood dimensions, open side gaps, outlet layout and seal requirements
- Exact grades, agreed weld/leak/fit tests, quantity, destination and packing
Quality checkpoints
- Solid floor, rim, chimney/hood count and overall geometry
- Side-outlet location, bore and agreed joint acceptance
- Hood gaps, supports, sealing interfaces and installation clearance
- Drawing-specific leak/fit and process-designer validation
Structure and function
The illustration has one shallow round pan with a continuous solid floor and rim, two rectangular gas risers under pitched sheet-metal hoods, open side gaps and one side draw-off stub. The pan collects liquid while the separately sized risers provide a vapor path. It has no final metering holes or filter medium and is distinct from a trough distributor or an individual slotted circular bubble-cap/riser assembly. Counts illustrate one drawing example.
Material selection
Specify pan/hood/riser sheets, draw-off tube, supports and weld-consumable grades and standards separately. Requests for 304, 316L or alternatives require review of forming, joining, liquid/vapor corrosion and cleaning. An illustrative metallic finish is not evidence of alloy, a pressure boundary or a certified service temperature.
Dimensions and custom range
Provide pan diameter/rim height/thickness, column fit, segment/seam and sealing drawings, rectangular riser section/height, hood profile/side gaps and side-outlet bore/projection/orientation. Factory drawing/sample review establishes feasible fabrication range and tolerances; process sizing, liquid level and vapor clear area are designer inputs.
Forming and welded assembly
Review circular sheet cutting, rim rolling, riser and hood folding, outlet preparation, fixture welding, deburring and cleaning. Agree seams, distortion allowance, sealing surfaces and any leak-test procedure on the sample. This is internal-component fabrication to approved drawings, not fabrication or certification of an entire pressure vessel.
Collection, gas path and installation review
The process designer specifies liquid head, collection and draw-off duty, vapor flow, hood clearances and acceptable pressure loss. Vessel/support design, sealed interfaces, access and installation sequence must be reviewed separately. No capacity, efficiency, level or pressure/temperature rating is implied. Dry application media show the intact part uninstalled beside an empty isolated column.
Packing and dispatch
Support the pan floor/outer rim and protect hood edges and the side draw-off from crate contact. Keep foam and loose material outside gas paths and the outlet. Agree lift/handling support, segmentation, finish protection, quantity and destination. Generated packaging and use media are illustrative, not proof of actual shipments, installations or performance.
MOQ and lead time
MOQ, feasible dimensions and lead time follow drawing/sample, material, tooling, inspection and quantity review. Below-MOQ sample inquiries are accepted for factory review. Confirm packing, destination and dispatch requirements before scheduling. No stock, price or delivery date is implied.